|
The course is approved by the Directorate General of Shipping and meets the
requirements laid down in Regulation I/12, Sections A-I/12, B-I/12 and Table
A-V/1-2-2 of the STCW Convention and Code as amended in 2010 and is in
compliance with IMO Model Course 1.36.
The LNG simulator is modelled on the Moss Rosenberg design 132,000 cum
LNG carrier having 4 cargo tanks. The cargo control system consist of 2HD and
2LD compressors, LD and HD heaters, vaporisers and forcing vaporiser, 2 deep
well cargo pumps of 1500 cum/hr and spray pumps 50 cum/hr. Boil off gases
can be sent to steam boiler. Tank valves can be operated/ controlled from CCR
and at the tank dome on the deck panel. Additionally there are temperature,
pressure and level gauges, fixed gas detection system, IGG plant and ESD.
Real time training is provided with Chief officer monitoring & controlling cargo
operations in CCR & duty officer conducting operations on deck.
|